A Quick Glance

  • black-arrow

    Delivered by highly qualified and experienced instructors

  • black-arrow

    Trusted globally by Leading Brands

  • black-arrow

    Understand how to implement Lean Six Sigma methods

  • black-arrow

    Higher Salaries after Certification

Whenever services or products are provided by an organisation, many waste processes creep up during the production phase. Typically there are seven kinds of such wastes - Defects, Overproduction, Waiting, Non-used employee talent, Transportation, Inventory, Motion, and Excessive Processing (remembered as DOWNTIME). The concepts of Lean Six Sigma help the organisation to do away with the waste processes.Japanese have termed this waste elimination processes as ‘muda’ which helps the organisation achieve the following aims:

  • Sort
  • Straighten
  • Shine
  • Standardise
  • Sustain

At Pentagon Training, the delegates get to know about the methodologies used by the Lean Six Sigma professionals from certified instructors.

Who should take this course

The target audience for this course are the professionals who hold a valid Lean Six Sigma Green Belt Certification.

  • Lean Six Sigma Black Belt Upgrade course is intended for those who are Lean Six Sigma Green Belt Certification holder and want to upgrade to Lean Six Sigma Black Belt Certification
  • The professionals who want to improve organisational processes by using the methodologies of Lean Six Sigma 
  • Individuals who already have experience of working in the same domain for over a year and who want to upgrade their skills in this domain
More

Prerequisites

The delegates need to possess a Lean Six Sigma Green Belt certification in order to attend this course.

More

What Will You Learn

  • Identify the optimal DMAIC tools 
  • Learn to identify and resolve problems that may occur in DMAIC projects
  • Learn how to effectively manage team dynamics and understand how to work with multiple levels of leadership for achieving success in organisational projects
  • Determine the relationship between key inputs and process outputs for statistical analysis
More

What's included

  Course Overview

Waste comes from unnecessary steps in the process of production within the organisation. On the other hand, waste also results from variation within the process in case of Six Sigma.  

Waste elimination can be achieved by following the principles laid down in the various Lean Six Sigma Belt courses. The Lean Six Sigma Black Belt Upgrade course is available to those professionals who have already certified as Lean Six Sigma Green Belt. The Black Belt Upgrade course allows the professionals to cover the contents of just the Lean Six Sigma Black Belt course. Unlike the Black Belt course under which Lean Six Sigma Yellow Belt and Green Belt are covered, this upgrade course covers neither of them.

EXAM:

The exam will be conducted at the end of the trainingThe exam consists of 100 Multiple Choice, scenario based Questions (MCQ’s).The delegate would need to choose one correct answer  from the given four and proceed further.

One will need to have 70 percentage marks i.e. 70 questions must be correct from 100 to clear the exam. Our trainers will make sure that the delegates have gone through all the concepts of the subject so that they can easily clear the exam in the first attempt.

The language used in the exam would be English. In case, the delegate is not comfortable with the exam in English; we can try to provide the exam in another language by consulting our trainer or management. Selection of language depends upon the comfort of the trainer. Therefore, we can’t guarantee this will happen.

All other details regarding exams will be provided during the training by our experts.

More

  Course Content

Section 1

  • Quick review of Lean Six Sigma Green Belt
  • Project Charters or Workshop
  • Jobs to be Done
  • Expectations on results
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Section 2

  • Reviews of Project
  • Review of Assumption Testing
  • Methods and Techniques of Minitab Graphical
  • Flow Review
  • Central Limit Theorem
  • Confidence Intervals
  • Pull Review
  • Mean & Variance Tests
  • Proportions Testing
  • Contingency Tables GOF
  • Sample Size Selection
  • Correlation/Linear Regression
  • One Way ANOVA
  • Improving Phase Roadmap
  • Getting Familiar With Design of Experiments (DOE)
  • Full Factorial Designs
  • 2K Factorial Designs
  • Attribute DOE
  • Project Reviews

Section 3

  • 2K Fractional DOE Designs
  • Simulation Exercise DMAIC / DOE
  • Logistic Regression – An Introduction
  • Advanced Regression
  • Introduction to Control Charts
  • Variable SPC Techniques
  • Attribute SPC Techniques
  • Control Methods
  • Introducing  Surveys

DMAIC Review & Final Reports

More

Lean Six Sigma Black Belt Upgrade

What is Lean?

Lean is the mathematical approach for streamlining both service processes and manufacturing by removing waste while continuing to deliver value to customers or clients. Lean is not just a set of tools; it stems from cultural roots which manifest in the business. A Lean Culture also called Lean Management is the foundation of improvement of Lean Process. During Lean Culture, improvement is exponentially more likely to be sustained so that a continuous improvement environment can be created in the organisation. It is the combination of defining customer value, aligning around a central purpose, striving for perfection while respecting and developing employees at the same time.

A Lean Process has following characteristics:

  • A lean process is usually faster than other processes
  • It is more efficient and economical than others
  • It also delivers satisfactory quality services to customers

A Lean system can be achieved by removing waste from the processes that are no more needed to have a successful outcome for the project. After completely removing the waste, we only include those steps which are required for customer satisfaction.

What is the Lean Six Sigma process?

Lean Six Sigma process includes following steps:

  • Define
  • Measure
  • Analyse
  • Improve
  • Control


Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at +44 1344 961530 or info@pentagonit.co.uk for more information.

About Carlisle

Carlisle, a city in Cumbria, is also the managerial centre of the City of Carlisle region in North West England. It is the main settlement in the county of Cumbria and helps as the managerial centre for both Carlisle City Council and Cumbria County Council. At the time of the 2001 survey, the population of Carlisle was 71,773. In 2011, the city's population had increased to 75,306, with 107,524 in the wider city.

The early history of Carlisle is noticeable as a Roman payment, recognised to serve the forts on Hadrian's Wall. In the Middle Ages, because of its nearness to the Realm of Scotland, Carlisle industrialised meaningfully. The armed stranglehold, Carlisle Castle, was built in 1092 by William Rufus, and once added as a custodial for Mary, Queen of Scots. The castle now relatives the Duke of Lancaster's Regiment and the Border Regiment Museum. In the 12th century, Henry I allowed the building of a priory in Carlisle. The town produced the rank of a city when its diocese was formed in 1133, and the cloister industrialised Carlisle Cathedral.

Governance:

Carlisle has detained city status since the Middle Ages. Also, it kept its status as an area constituency or governmental borough for centuries, at one time returning two MPs. In 1835 it became a municipal borough and was later upgraded to a  borough status in 1914. The city's boundaries have changed several times since 1835 the final time in 1974. 

The municipal area surrounded many parts of parishes which were combined into a single civil parish of Carlisle in 1904. The currently present urban area is considered as an unparished area. Carlisle had in 2002 made an unsuccessful attempt to grow to a Lord Mayoralty. An iconic building that stands tallest in Carlisle may be demolished, and the area nearby to it rehabilitated.

Climate:

Carlisle practices an oceanic climate. In January 2005 Carlisle was hit by strong wind storms and torrential rains. On Saturday 8 January 2005 all roads into Carlisle were shut owed to severe flooding, the worst since 1822, which produced three deaths. Less severe but still significant flooding occurred in 2009, but due to Storm Desmond. Carlisle experienced even worse flooding than 2005 between Friday 4 and Sunday 6 December 2015. During this time, nearly 36 hours of nonstop precipitation broke flood defences. This left several areas submerged including Bitts Park, Hardwicke Circus and Warwick Road. This left the famous Sands Centre, stranded from the rest of the city. As several other areas of Cumbria were also severely pretentious, all trains to Scotland were postponed forever. The trains on the West Coast Principal went no further than Preston. Prime Minister David Cameron stayed the city on 7 December 2015 to measure the damage.

More