A Quick Glance

  • black-arrow

    Delivered by highly qualified and experienced instructors

  • black-arrow

    Trusted globally by Leading Brands

  • black-arrow

    Understand how to implement Lean Six Sigma methods

  • black-arrow

    Higher Salaries after Certification

Whenever services or products are provided by an organisation, many waste processes creep up during the production phase. Typically there are seven kinds of such wastes - Defects, Overproduction, Waiting, Non-used employee talent, Transportation, Inventory, Motion, and Excessive Processing (remembered as DOWNTIME). The concepts of Lean Six Sigma help the organisation to do away with the waste processes.Japanese have termed this waste elimination processes as ‘muda’ which helps the organisation achieve the following aims:

  • Sort
  • Straighten
  • Shine
  • Standardise
  • Sustain

At Pentagon Training, the delegates get to know about the methodologies used by the Lean Six Sigma professionals from certified instructors.

Who should take this course

The target audience for this course are the professionals who hold a valid Lean Six Sigma Green Belt Certification.

  • Lean Six Sigma Black Belt Upgrade course is intended for those who are Lean Six Sigma Green Belt Certification holder and want to upgrade to Lean Six Sigma Black Belt Certification
  • The professionals who want to improve organisational processes by using the methodologies of Lean Six Sigma 
  • Individuals who already have experience of working in the same domain for over a year and who want to upgrade their skills in this domain
More

Prerequisites

The delegates need to possess a Lean Six Sigma Green Belt certification in order to attend this course.

More

What Will You Learn

  • Identify the optimal DMAIC tools 
  • Learn to identify and resolve problems that may occur in DMAIC projects
  • Learn how to effectively manage team dynamics and understand how to work with multiple levels of leadership for achieving success in organisational projects
  • Determine the relationship between key inputs and process outputs for statistical analysis
More

What's included

  Course Overview

Waste comes from unnecessary steps in the process of production within the organisation. On the other hand, waste also results from variation within the process in case of Six Sigma.  

Waste elimination can be achieved by following the principles laid down in the various Lean Six Sigma Belt courses. The Lean Six Sigma Black Belt Upgrade course is available to those professionals who have already certified as Lean Six Sigma Green Belt. The Black Belt Upgrade course allows the professionals to cover the contents of just the Lean Six Sigma Black Belt course. Unlike the Black Belt course under which Lean Six Sigma Yellow Belt and Green Belt are covered, this upgrade course covers neither of them.

EXAM:

The exam will be conducted at the end of the trainingThe exam consists of 100 Multiple Choice, scenario based Questions (MCQ’s).The delegate would need to choose one correct answer  from the given four and proceed further.

One will need to have 70 percentage marks i.e. 70 questions must be correct from 100 to clear the exam. Our trainers will make sure that the delegates have gone through all the concepts of the subject so that they can easily clear the exam in the first attempt.

The language used in the exam would be English. In case, the delegate is not comfortable with the exam in English; we can try to provide the exam in another language by consulting our trainer or management. Selection of language depends upon the comfort of the trainer. Therefore, we can’t guarantee this will happen.

All other details regarding exams will be provided during the training by our experts.

More

  Course Content

Section 1

  • Quick review of Lean Six Sigma Green Belt
  • Project Charters or Workshop
  • Jobs to be Done
  • Expectations on results
  • What is Minitab?
  • Basic Statistics 2
  • Project Report Outs
  • Daily Tech backs
  • Define Change Management
  • Exercise based on Value Stream Mapping
  • Project Management
  • Measurement System Analysis
    • Attribute Agreement Analysis
    • Continuous Data
  • Capability Analysis
    • Attribute Data
    • Continuous Normal Data
    • Continuous Non-normal D

Section 2

  • Reviews of Project
  • Review of Assumption Testing
  • Methods and Techniques of Minitab Graphical
  • Flow Review
  • Central Limit Theorem
  • Confidence Intervals
  • Pull Review
  • Mean & Variance Tests
  • Proportions Testing
  • Contingency Tables GOF
  • Sample Size Selection
  • Correlation/Linear Regression
  • One Way ANOVA
  • Improving Phase Roadmap
  • Getting Familiar With Design of Experiments (DOE)
  • Full Factorial Designs
  • 2K Factorial Designs
  • Attribute DOE
  • Project Reviews

Section 3

  • 2K Fractional DOE Designs
  • Simulation Exercise DMAIC / DOE
  • Logistic Regression – An Introduction
  • Advanced Regression
  • Introduction to Control Charts
  • Variable SPC Techniques
  • Attribute SPC Techniques
  • Control Methods
  • Introducing  Surveys

DMAIC Review & Final Reports

More

Lean Six Sigma Black Belt Upgrade

What is Lean?

Lean is the mathematical approach for streamlining both service processes and manufacturing by removing waste while continuing to deliver value to customers or clients. Lean is not just a set of tools; it stems from cultural roots which manifest in the business. A Lean Culture also called Lean Management is the foundation of improvement of Lean Process. During Lean Culture, improvement is exponentially more likely to be sustained so that a continuous improvement environment can be created in the organisation. It is the combination of defining customer value, aligning around a central purpose, striving for perfection while respecting and developing employees at the same time.

A Lean Process has following characteristics:

  • A lean process is usually faster than other processes
  • It is more efficient and economical than others
  • It also delivers satisfactory quality services to customers

A Lean system can be achieved by removing waste from the processes that are no more needed to have a successful outcome for the project. After completely removing the waste, we only include those steps which are required for customer satisfaction.

What is the Lean Six Sigma process?

Lean Six Sigma process includes following steps:

  • Define
  • Measure
  • Analyse
  • Improve
  • Control


Lean Six Sigma Black Belt Upgrade Enquiry

 

Enquire Now


----- OR -------

Reach us at +44 1344 961530 or info@pentagonit.co.uk for more information.

About Poole

Poole

Poole is situated on the south coast of England in the county of Dorset. It is also treated as a seaport and a large coastal town. Poole is 33 km east of Dorchester and also joins Bournemouth in the east. In 1997 local Council Borough of Poole was made a unitary authority. It gained its administrative independence from Dorset County Council. According to 2011 Census, Borough had a population of 147,645. This population made it second largest town in Dorset.

Along with Bournemouth and Christchurch, town forms South East Dorset Conurbation. It had a total population of over 465,000.

Human settlement in Poole started back before the Iron Age. Town’s name was earliest recorded in the 12th century when town emerged as an important port. With the introduction of wool trade, this town prospered. The Later city developed significant trade links with North America. During the 18th century, it was one of the busiest ports in Britain. During Second World War, Poole was main departing ports for Normandy landings.

Poole is also a tourist resort that attracts many visitors. Poole is popular due to its natural harbour, incredible history, Lighthouse arts centre and Blue Flag beaches. Royal National LifeBoat Institution headquarters are also located in Poole. Royal Marines have a base in town’s harbour. Poole is also home to Arts University Bournemouth, an important part of Bournemouth University and Bournemouth Symphony Orchestra.

History

During the 19th century, there was a coastal trade to and from Poole. Trade declined rapidly when the railway was built to Hamworthy side of the bridge. People in business were now able to transport goods to and from Poole with the help of rail. In 1872 another railway was built in the middle of the Poole. During 19th century life in Poole improved. In 1887 first public library was opened. In 1890 Poole Park was opened, and in the same year, Parkstone Park was opened.

In novels of Gullivers Travels, Lilliput was the name of the land. According to some information, there was a house called Lilliput. This house existed at beginning of 19th century, and this gave this area a name Lilliput.

Electric trams started running during 1901 through the streets of the Poole, but then buses replaced them. In 1935 last trams ran in Poole.

In 1910 first cinema in Poole was opened. Municipal offices at Poole were built in the year 1932. The population of Poole was 19,000 in the 20th century, but later it grew at a phenomenal rate. Old industries of brick making, brewing and shipbuilding decline during the 20th century. Pottery industry survived somehow. In 1969 Dolphin Centre was opened. Poole general hospital was opened in 1969. In 1974 Poole Lifeboat Museum was opened. In 1978 Arts Centre was opened. Poole became a unitary authority in the year 1997. In the 21st century, Poole has become a Pottery Centre which made it an attractive tourist destination. Today Poole flourishes on Tourism. In 2007 Poole Museum was reopened. Present Population of Poole is 138,000.

 

More